Swing Bridge

Built by Sir W.G. Armstrong's company to replace the 1781 stone bridge demolished in 1868, this span was designed to let larger ships reach Armstrong's works upstream. It carried its first road traffic on 15 June 1876 and first opened for river traffic on 17 July 1876, turning on hydraulic machinery that is still in use, now electrically powered, roughly four times a week. The Roman crossing Pons Aelius stood on approximately the same site around 122. It is listed Grade II*.

Movable Bridge Type
swing
Vertical Layer
1
Number of Traffic Lanes
2
Speed Limit
30 mph
Wikipedia Link
en.wikipedia.org/wiki/Swing_Bridge,_River_Tyne

Category: Culture & History

Tags: 1876, swing bridge, grade ii*, armstrong, hydraulic

Swing Bridge

Coordinates: 54.9670216, -1.6070755

Part of The bridges over the Tyne between Newcastle and Gateshead

More in The bridges over the Tyne between Newcastle and Gateshead

Related collections