McGill

The REM's downtown transfer to the Metro's Green Line, underground and inside the RÉSO network, so the walk between systems stays indoors. It was not in the original 2016 plan: it was one of three stations added that November specifically to tie the REM into the Metro. REM service here began on 17 November 2025.

Branch
Main line
Municipality
Montréal
Operator
Société de transport de Montréal

Category: Transport

Tags: green line, interchange, underground, réso

McGill

Coordinates: 45.5040687, -73.5715335

Part of The stations of Montreal's REM

More in The stations of Montreal's REM

Related collections