Aquabox

A relocatable indoor pool assembled from prefabricated timber modules in a matter of weeks on Kelterplatz, built to cover Zuffenhausen while its own Hallenbad is rebuilt. The tank is 25 metres with five lanes, shared between schools, clubs and public swimming, and it opened on 22 September 2026 as one of the official projects of the IBA'27 building exhibition. The forward-set entrance module is reached by a ramp, and the whole structure is designed to be dismantled and put up again elsewhere in the city once Zuffenhausen's replacement is finished.

Address
Haldenrainstraße 25, 70437 Stuttgart-Zuffenhausen
Wheelchair accessible
Yes

Category: Sports & Recreation

Tags: indoor pool, 25m pool, temporary, timber construction

Coordinates: 48.8302357, 9.1780263

Part of Stuttgart's public baths

More in Stuttgart's public baths

Related collections